Mining

Argentina Metals controls 146,700 hectares across 26 copper exploration projects
146,700 hectares across 26 copper projects

Argentina Metals Lists on TSX Venture to Fund Copper Exploration in Mendoza

The Canadian company rang the Toronto exchange's opening bell on July 10, with Mendoza Governor Alfredo Cornejo and provincial minister Jimena Latorre present. Its shares have traded since June at C$0.30. It controls 146,700 hectares across 26 projects in the Malargüe Western district, with Las Estrellas as its flagship.

Southern Energy will receive the first pipe for its dedicated export gas line in August, CEO Rodolfo Freyre said, dating the start of construction.
Shale24-Santander Energy Summit

Southern Energy Sets August Pipeline Start as Argentina Nears First LNG Exports

At the Shale24-Santander Energy Summit, CEO Rodolfo Freyre dated the start of construction on the 471-km dedicated pipeline and walked through the engineering still standing between the project and its first export cargo: a mooring system being built in Europe and anchored at 40 meters, a logistics base that does not yet exist at the Río Negro port, and a dedicated line that required project finance.

Julián Guarino

Standing up in this sector means accepting large-scale challenges: technical, operational, human and social.
Opinion for International Women’s Day

Talent to lead: a broader conversation than gender

What is it like to be a woman leading an energy or mining company? The question is valid, but perhaps incomplete. Because the real challenge — and also the real opportunity — is another: how to build organizations where talent is the decisive criterion for leadership.

María Eugenia Sampalione

Geographic location of the Vicuña District, one of the world’s most promising mining areas.
Binational mining

Copper: Vicuña project sets export logistics through Chilean ports

The project combining Josemaría and Filo del Sol has defined its logistics route through Chilean ports and structured an international credit line for the initial phase. The plan includes three development stages, a 70-year lifespan, and an average annual copper production of 400,000 tons, generating fiscal and employment impacts for both Argentina and Chile.

Matías Astore